I've heard nothing. It's probably one of those projects that has "fallen through the gaps". Frankly, with the uncertainty of the current Covid situation, it's not exactly a surprise. If I were managing it, I'd be a little loath to be going full steam ahead with a facility that will incur massive start up costs that would be nigh on impossible to recoup under the current regulations. And I'm DESPERATE for this to go ahead so I can move back to "my" island!